ANI
Generic Study (1989)
- Generic
end-states used.
- Included
cost information from the accident at Three Mile Island Unit
2, both in severity and cost.
- Estimated
both PWR and BWR cleanup costs for generic 800 MWe plants.
Diablo
Canyon, Palo Verde and Ginna Studies (1990-1991)
- Customized
the Generic Study to Diablo Canyon.
- Dose
rates determined using plant-specific configuration and dimensions.
- Overhead
quantified using plant-specific costs.
- Costs
scaled to other end-states using industry guidelines.
Waterford
Study (1991-1992)
- End-states
developed corresponding to actual plant-specific PRA accident
sequences.
- Benchmarking
of costs to TMI-2 performed in a more sophisticated manner
regarding fission product inventory and release.
- Productivity
factor incorporated to reflect crew replacements due to burnout.
- Support
activities scaled to workscope prior to labor adjustment for
dose.
- Overhead
itemized as staffing and G&A costs.
- Scaling
to other end-states performed on a technical basis by labor
category instead of using global scaling factors from AIF/NESP-036.
- Costs
presented in relation to PRA probabilities of occurrence.
- Damaged
property analysis.
ANI
Small BWR Study (1992)
- Included
insurance recovery.
- Analyzed
undamaged property.
- Determined
decommissioning shortfall.
|
Waterford
Study (1991-1992)
- End-states
developed corresponding to actual plant-specific PRA accident
sequences.
- Benchmarking
of costs to TMI-2 performed in a more sophisticated manner
regarding fission product inventory and release.
- Productivity
factor incorporated to reflect crew replacements due to burnout.
- Support
activities scaled to workscope prior to labor adjustment for
dose.
- Overhead
itemized as staffing and G&A costs.
- Scaling
to other end-states performed on a technical basis by labor
category instead of using global scaling factors from AIF/NESP-036.
- Costs
presented in relation to PRA probabilities of occurrence.
- Damaged
property analysis.
ANI
Small BWR Study (1992)
- Included
insurance recovery.
- Analyzed
undamaged property.
- Determined
decommissioning shortfall.
SACAS
(1993)
- Incorporated
lessons learned and improved information from previous studies.
- Consolidated
the numerous databases and calculations into one program.
- Benchmarked
successfully against TMI-2 accident costs.
- Updated
to include new coverage limits, functional total loss, NML/ANI
split, etc.
- Provides
convenient method for data input and analysis.
NML
Cash Flow Following
A Severe Reactor Accident (1995)
- Included
evaluation of five nuclear power plants representing a cross-section
of the industry.
- Determined
the cashflow resulting from a TMI
- Type
accident utilizing the insurance coverages selected in effect
at each utility.
NML
Property Damage and Restart Analysis (1996)
- Evaluated
the liklihood of restart following a range of accidents
- Review
the events that could lead to a total loss of the plant
- Analyzed
the criteria for restart following a severe accident
|